6 months performance report
It is now late June, time to take a look at how our solar installation has been performing over the last six months. To recap, the system is a 5.2kW rooftop installation using 22 240W Sunpower ACPV panels with integrated microinverters (see detailed writeup at http://kuzyatech.com/going-solar). It was turned on in early December of 2013 and has been pumping energy since then. So what did we produce so far?